Project Name: 4-Laning of Ujjain-Badnawar Section of NH-752D from km 26.9 to km 96.00 (Length-69.1 km) in the State of Madhya Pradesh on Hybrid Annuity Mode
Authority: National Highways Authority of India
Independent Engineer: M/s L. N. Malviya Infra Project Pvt. Ltd. in Association with M/s Intratech Civil Solutions & Consultants
SPV Incorporated on: 19.04.2022
GRIL equity interest control in SPV: 100%
Total Length of the Project: 69.100 km
Bid Project Cost: 907.00 Cr.
Date of LoA: 24.03.2022
Agreement signed on: 10.05.2022