Salient Features

Salient Features of Project

Particulars Details/Status
Project Name 4-Laning of Ujjain-Badnawar Section of NH-752D from km 26.9 to km 96.00 (Length-69.1 km) in the State of Madhya Pradesh on Hybrid Annuity Mode
NH No. (New/old) NH-752D
Scheme/Phase Bharatmala Pariyojana
Mode of Execution Hybrid Annuity Mode (HAM)
Concessionaire Name M/s GR Ujjain Badnawar Highway Private Limited
Date of Letter of Award (LOA) 24.03.2022
Appointed Date 10.10.2022
Construction Period (in Days) 730 Days from the Appointed Date
Schedule Completion Date 08.10.2024
Operation & Maintenance Period 15 years from COD
Authority Name National Highways Authority of India, PIU-Ujjain
Independent Engineer M/s L. N. Malviya Infra Projects Private Limited, Bhopal
Independent Mobilization Date 17.10.2022 
No. of Lanes/ Configuration 4 Lane
Bid Project Cost 907.00 Cr.
Total Length of the Project 69.100 km
No. of Interchanges 01 no.
No. of ROB 02 nos.
No. of Flyovers 02 nos.
No. of Underpasses VUP-13 no., LVUP-12 nos., SVUP-06 nos.
No. of Major Bridges 04 nos.
No. of Minor Bridges 07 nos.
No. of Bypasses (Name of Town, Length) Ujjain Bypass – 13.580 km
Badnagar Bypass – 9.060 km
Badnawar Bypass – 5.530 km
No. of Culverts Box Culverts (reconstruction): 08 nos.
Box Culverts (new construction): 127 nos. + 5 nos. additional
Toll Plaza 01 no.